Preparing for delivery day: access, unloading and goods receipt
A controlled goods receipt starts well before the delivery vehicle arrives. This guide explains how to prepare access, the unloading area, helpers, equipment, package checks and temporary storage systematically.

Delivery of a greenhouse, pergola or outdoor sauna is not an ordinary parcel drop-off. Depending on your order, packages may be long, heavy, delicate or impossible for one person to handle. The installation site is often behind the house, while the delivery vehicle can reach only the property entrance or a roadside unloading point.
Reliable goods receipt therefore starts before the driver arrives. Access, unloading space, helpers, transport route, storage area and responsibilities should be clearly agreed in advance. The steps below help you prepare for delivery day in a controlled way, without unnecessarily combining receipt, unloading and installation. Find further information about ordering under How to order and in Shopping & delivery.
Delivery planning at a glance
Five elements must work together for an orderly delivery: the vehicle must reach the agreed handover point, unloading must be safe there, suitable people and equipment must be available, every package must be checked, and protected storage must follow.
| When | Task | Purpose |
|---|---|---|
| Before ordering | Assess access, product route and installation site | Avoid unsolvable transport problems |
| After ordering | Set out unloading and storage areas | Plan a clear material route |
| Before delivery day | Arrange helpers, equipment and availability | Avoid delays on arrival |
| On arrival | Guide the vehicle and secure unloading | Enable a controlled handover |
| After unloading | Count, inspect, photograph and store packages | Record the delivery condition clearly |
The delivery terms provided for your order always apply. Clarify questions about a specific order through Contact before delivery day.

1. Check access before ordering
Assess access from the perspective of a delivery vehicle, not a passenger car. A driveway may be easy for a car to use but unsuitable for delivery because of tight bends, parked vehicles, low branches, roof overhangs, weight restrictions or a lack of turning space.
Follow the whole route from the public road to the planned handover point. Consider turning radii, gate widths, slopes, ground strength and overhead obstructions. Also check whether the vehicle can leave forwards after unloading or would need to turn. A cul-de-sac, narrow private road or nearby construction work can substantially change the plan.
Property access checklist
- Is the address easy to find and the house number visible?
- Can the driveway be used without touching gateposts, walls, hedges or roof edges?
- Have branches, cables, lights and other overhead obstructions been considered?
- Is the ground sufficiently firm and level in the expected weather?
- Are there access, weight, height or time restrictions?
- Do parked vehicles, bins or building materials obstruct manoeuvring space?
- Can the vehicle stop safely without obstructing traffic or creating a hazard?
- Can someone guide the vehicle without people entering the manoeuvring area?
If unloading could affect a public road or pavement, ask the relevant municipality or road authority beforehand what arrangements apply. For the later structure, also check the planning and building-control requirements for the site; start with the article Planning approval for a greenhouse or pergola in South Africa.
2. Define unloading and staging areas
The unloading area and installation area are not automatically the same. The first must be accessible for handover, load-bearing and clear of obstructions. The second should accommodate packages so they can be counted, checked and later moved onward in a sensible sequence.
Plan a direct material route: vehicle, unloading zone, checking zone, temporary storage and installation site. Avoid stairs, loose gravel, narrow garden gates or newly planted beds where possible. Long packages need much more turning room than their width alone suggests.
The ground should be clean, level and dry. Do not place packaging directly in mud, puddles or on sharp stones. Use suitable stable supports without propping packages at points that could deform them. Traffic routes and escape routes must remain clear.
Consider the product type. An Elma S outdoor sauna, a HC150 barrel sauna or a larger HCF 300 barrel sauna may have different packaging and handling requirements from a greenhouse. Always check order-specific information and do not estimate space requirements from product images alone.
3. Coordinate people, equipment and responsibilities
The person receiving the delivery must know the order, be able to make decisions and remain reachable during the expected period. Arrange enough suitable helpers for the work genuinely required. Do not assume neighbours will be available at short notice or that the driver will carry materials to the final installation site.
Equipment must suit the packaging, weight, ground and route. Use only equipment intended for the task and safely operated by competent people. Improvised levers, unstable trolleys or unsuitable garden tools increase the risk of injury and damage. Specific requirements arise from the order and agreed delivery method.
Assign these roles for delivery day
- Contact person: communicates with the driver or carrier and keeps order documents ready.
- Vehicle guide: monitors access and the manoeuvring area from a safe position.
- Unloading coordinator: decides where each package will be placed.
- Inspection person: counts packages, checks markings and records irregularities.
- Route monitor: keeps children, pets and uninvolved people away from the work area.
One person may take on several roles, provided the tasks can still be managed safely at the same time. For dealer or business-process queries, see Dealers .

4. Prepare during the days before arrival
- Check delivery information: Compare the address, telephone number, delivery contents and all received instructions.
- Clear access: Remove vehicles, trailers, bicycles, waste bins and loose items.
- Watch the weather: Rain, frost, snow or softened ground can change access and handling conditions.
- Mark areas: Decide where each package should be placed.
- Prepare documentation: Keep a mobile phone or camera, a way to make notes and order documents ready.
- Clear temporary storage: Create a dry, clean area protected against unauthorised access.
- Review installation instructions: This helps identify early whether particular assemblies should be stored separately or in sequence.
Also check the installation site independently of delivery day. For pergolas, the pergola size guide helps with space planning, while the pergola foundation guide is relevant to the base. Preparing a foundation and accepting delivery are separate tasks, but they must be coordinated in time.
5. Follow a controlled arrival process
When the vehicle arrives, do not unload immediately. Meet the driver at the agreed point, confirm the delivery address and discuss where the vehicle should stop and unload. Point out visible obstructions, soft ground, narrow points or areas that cannot bear the load.
During manoeuvring, nobody should stand behind the vehicle, between the vehicle and a building, or in other poorly visible positions. Children and pets must remain completely outside the area. Only one person should give clear guiding signals; several helpers shouting at once creates confusion.
Before starting, check whether conditions have changed since planning. A parked car, a neighbour's delivery van, strong wind or wet lawn may require a different decision. Safety and avoiding damage take priority over the fastest possible unloading.

6. Unload without losing control of packages
Place packages in an orderly way and keep labels visible where possible. Do not stack randomly or stand sensitive units, or units specifically requiring another storage position, on an unsuitable edge. Follow packaging instructions.
Count as unloading proceeds. A simple running list prevents packages from being counted twice or overlooked in different places. Small hardware or accessory boxes should not disappear beneath long profile packages. Separate by construction stages only where labelling remains clear.
Do not open or alter packaging in the active unloading area. At this stage, focus on a safe handover, quantity and externally visible condition. Carry out a detailed contents check afterwards in a suitable place using the available documents.
Stop unloading in these conditions
- People enter the danger area without control.
- The vehicle or an item of equipment is visibly unstable.
- The ground gives way, becomes slippery or is not sufficiently load-bearing.
- A package risks tipping, bending or slipping out of its restraint.
- Visibility between driver, vehicle guide and helpers is not assured.
- Strong wind or rain makes long or flat components unsafe to handle.
- The planned procedure differs substantially from the known delivery terms.
Do not improvise a quick solution in this situation. Secure the area, agree the next steps and contact Bloomcabin if deviations remain unclear.
7. Check and document the delivery
After unloading, compare the number of accepted packages with the available delivery documents. Inspect every unit all round for punctures, severe crushing, cracks, moisture, open seals or unusual distortion. Check the underside too, as long as this can be done without unsafe lifting.
First photograph the overall condition, then each irregularity from several angles. A wider image shows the package position; close-ups document the exact area. Record labels or package numbers clearly where present. Do not dispose of damaged packaging before the matter has been clarified.
Record visible irregularities at acceptance using the specified procedure. Do not sign without checking; read what you are confirming. A damaged carton does not automatically mean a component is damaged, but a small external dent must not be ignored. Information about applicable terms is available under Warranty.

8. Store components properly after acceptance
Original packaging protects only within its intended function; it does not replace suitable long-term storage. Store the delivery dry, stable, clean and protected against wind, tipping, theft and accidental access. Avoid direct ground contact, standing water and uncontrolled moisture.
Support long components so damaging sagging or point loading cannot occur. Do not place heavy packages on sensitive glazing, panel or surface elements. Follow orientation labels on packaging and keep hardware and small connecting parts together.
If outdoor storage appears unavoidable, first check whether it is suitable for the specific delivery and under which conditions. A loose tarpaulin can trap moisture, cause abrasion or come loose in wind. Repacking without approval also makes identification more difficult. The guide Caring for your aluminium greenhouse contains advice for later use and surface care.
9. Move from delivery to installation in the right order
Completing unloading does not mean the delivery is ready for installation. Finish the acceptance inspection first. Then organise packages by their labels and read the installation instructions fully. Check that the foundation, anchor points, tools, protective equipment and required specialist services are ready.
Do not open every package at once. Small parts can become mixed up, surfaces can be damaged and assignments can be lost. Follow the intended construction sequence and keep labels until parts are identified beyond doubt.
For greenhouse projects, the Greenhouses and conservatories and Useful information sections offer further guidance. South Africa-specific delivery information is available under buying a greenhouse with delivery to South Africa.
10. Avoid common delivery-day mistakes
- Measuring only the product footprint: unloading and onward transport need extra movement and turning space.
- Planning for the driver as an installation helper: services can only be expected in line with the agreed delivery method.
- Unloading on grass without checking ground strength: moisture can make previously firm ground unusable.
- Opening all packaging immediately: this increases the risks of mix-ups, loss and damage.
- Signing for packages without checking: visible irregularities should be documented at handover.
- Starting installation under time pressure: missing parts, unresolved damage or an unfinished foundation must be addressed first.
- Discarding packaging too early: labels and protective materials may still be needed.
- Confusing access with planning approval: a possible delivery does not show that a project is permitted at the site.
Product choice also affects logistics. Compare, for example, bioclimatic and classic pergolas or wall-mounted and freestanding pergolas before finalising access and installation planning. For saunas, do not judge models such as the Elma L outdoor sauna, the HC 225 barrel sauna and the HCF 225 barrel sauna by external shape alone. The specific order and delivery information always applies.

Prepare the greenhouse for use after installation
After installation, cleaning, functional checks, fitting out and gardening preparation follow. Remove packaging remnants and check that doors, ventilation elements and other moving components work according to the documentation. Only then should paths, planting benches, irrigation or growing areas be arranged.
For a first introduction, see the beginner's guide to greenhouse gardening. Climate and crop management are explained in the guide to greenhouse temperature and humidity . The spring guide to cleaning and planting preparation helps with seasonal set-up.
For material planning, the article about polycarbonate, multiwall panels and insulation can explain key relationships. Anyone planning a more formal structure will also find guidance in the orangerie greenhouse guide. Practical growing ideas are offered, for example, in the guide to growing peppers and chillies in a greenhouse.
Frequently asked questions
Must I be present for delivery?
The delivery terms for your order apply. Regardless, an authorised, reachable person should be on site to provide access, identify the unloading point, inspect the delivery and give any required confirmations. Do not appoint an uninformed representative.
Will the driver carry packages to the greenhouse site?
Do not assume this without an explicit agreement. The handover point and scope of service depend on the confirmed delivery method. Plan transport within your property independently with suitable people and equipment.
How much space must I provide for unloading?
Requirements depend on the vehicle, package units, unloading method and local conditions. You need at least a safe vehicle position, working room beside or behind it, plus laydown and transport areas. Establish the exact requirements from your delivery information.
Can delivery be made onto grass or an unpaved driveway?
Only if the ground is suitable for the vehicle, unloading method and current weather, and the delivery terms permit it. Grass that appears dry on the surface may be soft beneath. Conditions must be assessed on site; when in doubt, provide a hard-standing handover point.
What should I do if a package looks damaged?
Stop any unsafe handling, photograph the package, label and damaged area, and record the irregularity under the specified acceptance procedure. Keep the packaging and contents, then report the matter with clear information.
Should I open every package while the driver waits?
Normally, quantity and external condition are checked first. Open packaging only where the specific procedure requires it or this has been agreed. Complete contents inspection should take place methodically using the documents.
Can I store greenhouse packages outdoors?
Avoid unprotected outdoor storage. Whether short-term storage is possible under particular conditions depends on the packaging and contents. In all cases, provide dry, stable, ventilated and secure storage, and follow product-specific instructions.
Can installation start immediately after unloading?
Only after the inspection is complete, packages are clearly assigned and the installation site has been checked. Foundation, tools, helpers and safety measures must be ready. Do not rush installation where damage, shortages or unsuitable weather remain unresolved.
Where can I find more information about Bloomcabin greenhouses?
An overview is available in Greenhouses and conservatories, About us and the Bloomcabin blog. You can also view other customers' experiences under greenhouse reviews .
Final goods-receipt checklist
- Delivery address, contact details and instructions checked
- Access, height, bends and manoeuvring area checked
- Locally required arrangements clarified in good time
- Unloading, inspection and storage areas cleared
- Suitable helpers and equipment arranged
- Children, pets and uninvolved people kept clear
- Packages counted continuously during unloading
- Packaging checked for visible irregularities
- Overall condition, labels and damage photographed
- Irregularities recorded under the specified procedure
- Components stored dry, stable and in order
- Installation started only after checks and preparation
Carefully planned goods receipt protects people, materials and the project schedule. The more clearly access, the handover point and responsibilities are defined beforehand, the lower the risk of having to improvise under time pressure on delivery day.